Cymbeline (2019)

Produce by Commonwealth Shakespeare Company | Boston, MA

• Spotlight Operator
• Electrics Intern
• Electrics Run Crew

(See gallery and video below)

Installation Process:

Involved:
– 1 Week Install Process
– Constructing metal truss to frame stage and hang equipment
– Hanging conventional and LED Ellipsoidal fixtures
– Hanging conventional and LED Par fix
– Hanging LED light bars
– Installing Spotlight and hanging Spotlight Seating on the truss
– Installing and wiring practicals (hanging and wall lanterns)
– Focusing all fixtures
– Operation and use of an Aerial Work Platform (Cherrypicker) to focus fixtures out of reach
– Running power to tech booth, front of house, merchandise, and food trucks.

Show Install Gallery:

CSC Show Preview: